The project involves the supervision of an eight-lane access-controlled expressway from Bawadi village (near Shivgarh) in Ratlam district, spanning km 627+420 to km 696+920 along the Delhi-Vadodara Greenfield Alignment (NH-148N). Executed under Bharatmala Pariyojana (Package-7) in Madhya Pradesh on EPC mode, this 69.50 km stretch includes 35 major bridges with a total length of 5,355 meters. The expressway aims to enhance connectivity, facilitate faster transportation, and boost trade between Delhi and Vadodara. It will significantly reduce travel time, improve logistics efficiency, and contribute to regional economic growth while ensuring modern infrastructure development.