Supervision of Extra-dosed Cable Stayed Jogighopa Bridge over Bramhaputra River
Length of Bridge
4385 M 2Lane
Length of extra-dosed Portion
2284 M
Max Span Length
125 M
Type of Foundation
Well & Pile
Supervision services are provided for the construction of an extra-dosed cable stayed bridge with its approaches spanning from Km 0+000 to Km 4+385, crossing the Brahmaputra River on NH-17 at Jogighopa in Assam, executed on an EPC basis. The bridge features a 2284-meter extra-dosed portion, incorporating a multi-pylon extradosed design with a maximum span of 125 meters. The main bridge over the Brahmaputra is supported by a robust well foundation, ensuring enhanced stability and durability. The project aims to improve regional connectivity and comply with rigorous engineering standards while addressing challenging riverine conditions. All activities adhere to strict project timelines.