The project involves the preparation of a Detailed Project Report (DPR) for four key road packages under Bharatmala Pariyojana in Andhra Pradesh. It includes the four-laning of NH-71 from Madanapalle to Pileru (Package-1) and Pileru to Kalur (Package-2), as well as the six-laning of NH-140 from Chittoor to Mallavaram (Package-3) and NH-71 from Renigunta to Naidupeta (Package-4). Executed on Hybrid Annuity Mode (HAM), the total project length is 212.191 km, with major structures spanning 11,890.175 meters. This initiative aims to enhance regional connectivity, improve traffic flow, and support economic growth through modern infrastructure development.