DPR Mandanepalle to Tirupati
Length
212.981 Km 4/6 Lane
Major Bridge 35 Nos Total Length
7044.22 M
Minor Bridges 48 Nos Total Length
991.90 M
RoB 5 Nos Total Length
1641.20 M
Flyover 16 Nos Total Length
825 M
AUP/AOP- 3 Nos Total Length
376M
The project involves the preparation of a Detailed Project Report (DPR) for four key road packages under Bharatmala Pariyojana in Andhra Pradesh. It includes the four-laning of NH-71 from Madanapalle to Pileru (Package-1) and Pileru to Kalur (Package-2), as well as the six-laning of NH-140 from Chittoor to Mallavaram (Package-3) and NH-71 from Renigunta to Naidupeta (Package-4). Executed on Hybrid Annuity Mode (HAM), the total project length is 212.191 km, with major structures spanning 11,890.175 meters. This initiative aims to enhance regional connectivity, improve traffic flow, and support economic growth through modern infrastructure development.